
Disaster recovery hosting places standby compute, storage and networking in a Metrobloks metro distinct from your production site — fitting operating models whose continuity posture cannot accept single-region exposure, and whose recovery posture demands a geographically separate facility with independent power, cooling and carrier diversity for failover and tabletop-tested DR runbooks.
Fibi sources Metrobloks Disaster Recovery Hosting at no cost to you. Our advisory is funded by the carrier.
We compare Metrobloks against 300+ carriers so you know you're getting the best solution for your needs.
Dedicated advisor for the life of your contract — Fibi escalates issues on your behalf so you're never dealing with carrier support alone.
More from Metrobloks
Colocation includes power, cooling, physical security, cross-connects to carriers and clouds, remote hands and cabinet/cage builds — fitting operating models whose infrastructure posture demands carrier-neutral interconnection, predictable power-and-cooling SLAs and the ability to scale rack-by-rack without renegotiating real estate and electrical capacity each cycle.
Edge data center capacity in tier-2 and tier-3 US metros places compute and storage closer to users and operations — fitting operating models whose latency, sovereignty and recovery posture benefits from metro-edge presence rather than concentration in a small set of hyperscale hubs.
Cross-connects deliver direct fiber paths between your cabinets and carriers, cloud on-ramps and other tenants inside the facility — fitting operating models whose network posture depends on diverse carrier reach and direct-to-cloud private connectivity rather than public internet transit for production workloads.
Dense power, redundant UPS and generator backup paired with air and liquid cooling — fitting operating models whose compute posture has shifted toward AI training, AI inference and dense GPU workloads, and whose facility posture cannot rely on legacy 5–10 kW-per-rack envelopes or air-only cooling once accelerator density crosses the threshold where liquid cooling becomes the only viable thermal path.